LED太阳能路灯调试系统工作是否正常;松开控制器上太阳板连接线,灯亮;同时接上太阳板连接线,灯熄;再仔细观察控制器上各指示灯的变化;一切属于正常,方可封好控制箱。
1、蓄电池置于防水箱内时须轻拿轻放,防止砸坏防水箱;
2、输出线连接在蓄电池后在任何情况下禁止短接,避免损坏蓄电池;
3、蓄电池的输出线与电线杆内的控制器相联时必须通过PVC穿线管;
4、上述完成后,检查控制器端的接线,防止短路。正常后关好控制箱的门。
1、太阳能电池板的输出正负极在连接到控制器前须采取措施避免短接;
2、太阳电池组件与支架连接时要牢固可靠;
3、组件的输出线应避免裸露,并用扎带扎牢;
4、电池组件的朝向要朝正南,以指南针指向为准。
Whether the LED solar street lamp debugging system works normally; Loosen the connection line of the sun board on the controller, the light will be on; At the same time, connect to the sun plate, the light is off; Carefully observe the changes of the indicators on the controller; Seal the control box until everything is normal.
1. When the battery is placed in the waterproof box, it must be handled with care to prevent damage to the waterproof water tank;
2. After the output line is connected to the battery, short connection is forbidden under any circumstances to avoid damage to the battery;
3, the output line of the battery and the controller in the pole must be connected through PVC threading pipe;
4. After the above, check the wiring of the controller to prevent short circuit. Close the door of the control box after normal.
1, solar panel output positive and negative poles before connecting to the controller must take measures to avoid short connection;
2. The solar cell module should be firmly and reliably connected with the bracket;
3, the output line of the component should avoid bare, and tie it securely;
4. The orientation of the battery components should be due south, as indicated by the compass.